Hobart and Russell Creighton Hall of Animal Sciences

and the Land O'Lakes Center for Experiential Learning

with the Adjacent Purina Pavilion


PHOTO GALLERY

Click on each photo for larger image

​Topping Out Celebration Photo Gallery 10/26/2016 - click link for images​

 

March 19, 2017 PGH March 19, 2017 DRUG

(L-R: 3/19/17: View from top of Harrison Street Parking Garage, and view from DRUG Discovery Building)

 March 8, 2017 DRUGMarch 7, 2017 PGHMarch 5, 2017 PGH
(L-R: 3/8/17: Brick being layed; 3/7/17: Walls going up on LOL; 3/5/17: View from top of Harrison Street Parking Garage)

January 29, 2017 PGHJanuary 29, 2017 DRUG
(L-R: 1/29/17: View from the top of Purdue's Harrison Street Parking Garage, and right image from DRUG Building.)

 January 22, 2017 PGHJanuary 22, 2017 DRUG January 7, 2017 DRUG
(L-R: 1/22/17: Main building steel for LOL is set and being racked, floor pans installed and roof set. The CRNT bldg is progressing nicely on the inside as wall studs being install on floor 3. the 2nd floor will be completed after floor 3. The roof progressed nicely over the last 1.5 weeks even through raining weather. As of mid-January, we're 70% complete on the roof. The SW exterior corner of CRTN is bricked to 3rd floor;
1/7/17: Most activity taking place inside CRNT)
January 7, 2017 PGH December 19, 2016 DRUG December 19, 2016 PGH
​(L-R: 1/7/17: Steel is going up for LOL; 12/19/16: Image from Drug Discovery building to our north east; 12/19/16: Progress on the inside,
rough in on the first floor is mostly complete.)
September 18, 2016September 18, 2016August 28, 2016
(L-R):  9/18/16: Steel is going up quickly. Foundations are mostly poured. Middle image is a look at the North face.
8/28/16: Basement walls and floor are poured and waterproofed. Part B is poured, part C are placed, and part A foundations are being poured.)
July 16, 2016June 16, 2016May 30, 2016
(L-R:  7/16/16: West stair tower is being built & steel has started for first floor deck; 5/16/16: Basement walls and elevator shaft;
5/30/16: Foundation and footers are laid.)
May 12, 2016April 28, 2016April 7, 2016
(L-R: 5/12/16: Project is 4% completed, excavation is nearly complete; 4/28/16: Demolition is 98% complete and excavation has started;
4/7/16: Lot clearing for new building.) 
March 7, 2016
(3/7/16: Food Storage Building)
Southeast Rendered ViewNortheast Rendered View​​
(L-R: Southeast Rendered View; Northeast Rendered View)


Department of Animal Sciences, 915 West State Street, West Lafayette, IN 47907 USA, (765) 494-4808

© Purdue University | An equal access/equal opportunity university | Integrity Statement | Copyright Complaints | Maintained by Agricultural Communication

Trouble with this page? Disability-related accessibility issue? Please contact us at agweb@purdue.edu so we can help.

Sign In